Project The CO2 shadow price in the water management administration of the state of Baden-Württemberg
Runtime 02/2023 – 09/2023
The project was launched by the Baden-Württemberg Ministry of the Environment, Climate Protection and the Energy Sector in order to comply with the state's Climate Protection and Climate Change Adapta
moreProject Timber Construction as a Solution Strategy for Climate Protection and Sustainable Urban Development in Weinstadt
Runtime 10/2022 – 01/2025
Timber is the world’s leading renewable building material and plays a crucial role in the development of sustainable construction methods. Its use in the building sector significantly reduces harmful
moreProject Ökologische Vorteile eines prioritären PET-Stoffkreislaufs für Einwegflaschen in Deutschland
Runtime 08/2022 – 03/2023
Die aktuelle Situation in Deutschland: mehr als 97 Prozent der PET-Einwegpfandflaschen werden über das Pfandsystem zurückgegeben. Weniger als die Hälfte des Materials aus dem Recycling von PET-Getränk
moreProject Material System Analysis (MSA) for Aggregates, Chromium, Coking Coal, Magnesium and Strontium
Runtime 03/2022 – 05/2023
Material System Analysis (MSA) investigates the flows of materials through an economy, in this project through the EU economy. The analysis includes stocks, trade flows as well as end-of-life treatmen
moreProject UBA Coffee To Go
Runtime 07/2017 – 12/2018
The change in living and working conditions over recent years has led to an increase in out-of-home consumption. Convenience also applies to the consumption of soft drinks and hot beverages. The total
moreProject System Comparison of Storable Renewable Energy Sources (SYSEET)
Runtime 03/2017 – 11/2018
Within the framework of the European climate policy and the Paris Agreement, Germany has committed itself to reducing the emission of CO 2 and other greenhouse gases by up to 95 percent by 2050. The m
moreProject Updating the input data for essential biogenic energy use paths (BioEm)
Runtime 06/2013 – 04/2015
The Federal Environment Agency (FEA) commissioned the project to calculate the emissions, resource and land use consumption balances for over 30 bio-energy pathways which reflect the main biomass usag
moreProject LCA packaging of sterilised food
Runtime 01/2012 – 12/2013
The “Comparative life cycle assessment of sterilised food packaging systems on the European market” analyses the environmental performance of the heat resistant food carton combisafe and the aseptic f
moreProject LCA of beverage carton combidome
Runtime 01/2011 – 12/2012
The “Comparative life cycle assessment of SIG beverage carton combidome and competing packaging systems for juice on the European market” investigates the environmental performance of the newly develo
moreProject LCA packaging of UHT milk
Runtime 01/2011 – 12/2012
The “Comparative life cycle assessment of packaging systems for UHT milk on the European market investigates how different SIG Combibloc beverage cartons for the packaging of perform in comparison to
moreTopics
Methods & Tools
-
Methods & Tools
13
- Calculation tools 1
- Life Cycle Assessment (LCA) and material flow analyses 13
- Sustainability assessment 1