Project BioWISE
Runtime 12/2020 – 07/2022
In Germany, more than half of final energy consumption is accounted for by heat. A heat transition towards a climate-neutral heat supply is therefore a key component of climate protection. With its re
moreProject DETECTIVE - Energy saving by digitalisation
Runtime 07/2020 – 09/2023
The smart meter rollout is ready to start. With the broad market introduction of new digital metering systems, the technical infrastructure for the digitisation of the transformation of the energy sys
moreProject Wärmewende: Die Energiewende im Wärmebereich
Runtime 06/2020 – 02/2023
Über die Hälfte der in Deutschland verbrauchten Energie wird zur Wärmeversorgung eingesetzt: für das Heizen von Häusern und Wohnungen, Büros und Geschäften, für Wärme für Industrie. Ohne eine klimaneu
moreProject EnEff:Wärme: ENA – Energy Planning to Enable Waste Heat Use in District Heating
Runtime 04/2020 – 12/2023
In order to achieve the climate protection goals by 2050, it is necessary to almost completely eliminate the greenhouse gas emissions from the heat supply of the building stock. This will be made poss
moreProject Potential analysis of renewable energies within the framework of RED II
Runtime 02/2020 – 06/2021
Article 15(7) of the Renewable Energy Directive (RED II) requires the European Commission to assess the potential for energy from renewable sources and the use of waste heat and cooling in the heating
moreProject Economic potential for efficient heating and cooling supply
Runtime 02/2020 – 04/2021
The European Energy Efficiency Directive 2012/27/EU (EED) provides for a comprehensive assessment of the potential for the use of high-efficiency cogeneration and efficient district heating and coolin
moreProject CO2 – school-calculator
Project start 12/2019
ifeu was involved in the development of a climate calculator for schools on behalf of Greenpeace as part of the ‘School for Earth’ project. The calculator is available for use by all schools free of c
moreProject Transform-R: Designing networks to support regional transformation processes
Runtime 12/2019 – 11/2022
Background Cooperation at the regional level is essential for the transformation to sustainability in Germany in order to be able to comply with the goals of the Paris Climate Agreement. For this, the
moreProject Decarbonisation of decentralised energy infrastructures
Project start 11/2019
The phase-out of coal-fired power generation by 2038 at the latest is a central element in meeting the climate protection targets of the Federal Republic of Germany for 2030 and 2050. A shutdown of co
moreProject Long-term Scenarios for the Transformation of the Energy System in Germany (Long-term Scenarios III)
Runtime 10/2019 – 12/2024
In the project, scenarios for the future development of the energy system are modelled to achieve the energy and climate policy goals. The modelling encompasses the entire energy system, i.e. the gene
more