Project Carbon-neutral state administration
Runtime 11/2024 – 04/2025
The Climate Act of the State of Hesse (HKlimaG), passed in January 2023, obliges the state administration to operate in a net greenhouse gas-neutral manner by 2030 and to achieve complete net GHG neut
moreProject KlimKreisBW
Runtime 10/2024 – 08/2025
The state of Baden-Württemberg has committed to becoming climate-neutral by 2040. The established sectoral targets for 2030 and 2040 are assessed according to the international reporting guidelines of
moreProject RoBW
Runtime 10/2024 – 01/2026
The project aims to carry out a comprehensive analysis of (metallic) raw material demand in Baden-Württemberg, combined with an assessment of the associated social, ecological and human rights risks i
moreProject ÜBER-AUS: Resource-efficient use of surplus and waste materials from the textile industry through the creation of regional recycling loops
Runtime 10/2024 – 09/2027
The textile industry generates significant amounts of waste before products reach the market. A large proportion of this waste consists of rejects, such as offcuts and fibre and yarn residues (post-in
moreProject The Key: Chemical recycling of polyester in fibre blends as a key enabler for a holistic, circular textile economy
Runtime 09/2024 – 08/2027
Today, textiles are often made of blended fabrics. Until now, it has not been possible to recycle several types of fibres simultaneously to a high standard. In the ‘The Key’ project, eight partners fr
moreProject SYMBIOSIS
Runtime 09/2024 – 08/2027
SYMBIOSIS aims to integrate biodiversity throughout the life cycle of railway infrastructure projects and to promote a collaborative and holistic approach to create sustainable and resilient infrastru
moreProject NaKuRa - Comparative life cycle assessment of artificial turf and sports turf systems
Runtime 06/2024 – 06/2026
As part of the overarching research project “NaKuRa: Sustainable synthetic turf pitch - development and investigation using the example of the town of Ellwangen”, which is funded by the Agency for Ren
moreProject CLEVER: Creating Legitimate Emission Factors For Verified GHG Emission Reductions in Transport
Runtime 06/2024 – 05/2027
The CLEVER project serves to standardize the calculation of greenhouse gas emissions in the transport sector - a decisive step towards achieving the goals of the Paris Climate Agreement. The focus is
moreProject Evaluation of the Substitute Building Materials Ordinance
Runtime 04/2024 – 07/2027
ifeu Heidelberg has been commissioned by the Federal Environment Agency to carry out scientific monitoring to evaluate and further develop the regulations of the Substitute Building Materials Ordinanc
moreProject BWeRoads
Runtime 01/2024 – 06/2026
The challenge: It is not easy for operators of public charging and H2 refueling infrastructure to estimate the volume of users that can be expected from electric trucks. Conversely, logistics companie
moreTopics
- Energy 27
- Mobility 9
- Nutritional transition 5
- Resources 33
- Industry and products 6
- Biomass 16