Project SKU balance sheet 2022
Runtime 10/2022 – 11/2023
The SKU balance sheet has been compiled every two years since 2010. The aim and objective is to further optimise Berlin's waste management and recycling economy, evaluate targets and control waste str
moreProject enERSyn - Electric Road Systems as part of truck electrification
Runtime 08/2022 – 07/2025
Background Like all other sectors, road freight transport will have to be essentially greenhouse gas neutral in the future. As things stand, this will mean an electric drive in almost all vehicles. Wi
moreProject Pr:Ins - Holistic evaluation of alternative protein sources with special consideration of insects
Runtime 07/2022 – 06/2025
With the " Bioeconomy Innovation Areas ", the BMBF supports the development of bioeconomic innovations as drivers for a sustainable, biobased economy. The topic of nutrition is addressed in the innova
moreProject ēQATOR
Runtime 06/2022 – 11/2025
The EU-funded ēQATOR project aims to develop scalable, electrically heated catalytic reactor technologies that will allow the conversion of biogas into syngas with improved efficiency compared to the
moreProject Material System Analysis (MSA) for Aggregates, Chromium, Coking Coal, Magnesium and Strontium
Runtime 03/2022 – 05/2023
Material System Analysis (MSA) investigates the flows of materials through an economy, in this project through the EU economy. The analysis includes stocks, trade flows as well as end-of-life treatmen
moreProject Biomethane in Europe
Runtime 03/2022 – 05/2022
With the REPowerEU plan, the European Commission aims to reduce Europe's dependence on Russian fossil fuels and strengthen the resilience of the EU-wide energy system. This is to be achieved by divers
moreProject DIFENs - Forest development as a result of changes in timber demand, climate change, natural disturbances and policy requirements
Runtime 12/2021 – 11/2024
Numerous studies have already analysed the development of forest stands, the volume of wood and carbon storage under various management scenarios - mostly based on federal forest inventories. Until no
moreProject Biowaste to Products (BW2Pro)
Runtime 10/2021 – 03/2024
As part of the ERDF funding programme ‘Bioeconomy Bio-Ab-Cycling’, the Baden-Württemberg Ministry for the Environment, Climate Protection and the Energy Sector is funding the construction of modular b
moreProject Updating and further development of the UBA CO₂ calculator
Runtime 09/2021 – 08/2024
Since 2007, ifeu has been working in cooperation with KlimAktiv on the development, expansion, and continuous improvement of the UBA CO2 calculator. Updating the data basis for the CO2 balance sheet A
moreProject EnaTex - Sustainability & Climate Protection in the textile industry
Runtime 08/2021 – 04/2025
Indonesia is an important partner for Germany in the textile supply chain and a buyer of modern textile machinery. The Indonesian textile industry with over 1.13 million employees ranks 15th on the li
moreTopics
- Energy 27
- Mobility 9
- Nutritional transition 5
- Resources 33
- Industry and products 6
- Biomass 16